Installation Verification

Energy Efficiency and Installation Verification

The installation verification phase of commissioning insures that installed equipment is in compliance with building codes, design-basis documents, and safety standards. This commissioning phase includes thorough reviews of equipment submittals, construction inspection, and other "static" reviews. The appropriateness of the equipment or system to accomplish its intended function is determined by comparing the installation with the design-basis documents, which includes an equipment submittal log. Connections to utilities, service sizing, written standard operating procedures, and preventive maintenance programs are also verified. [Flaherty and Gracilieri, 1994]

More:

Submittal review

Construction inspection

As-built conditions

Installation Test reports